TIGER
Together IP, GMPLS and Ethernet Reconsidered
Welcome > Deliverables

Deliverables


WP1

D10

Project Description

Ed. : N. Le Sauze (ALF)

Updated in July 2007

D11

Project Annual Report

Ed. : N. Le Sauze (ALF)

September 2007

D12

Project Final Report

Ed. : N. Le Sauze (ALF)

June 2008

WP2

D21

Requirement specification analysis

Ed. : N. Le Sauze (ALF)

March 2007

WP3

D31

Basic Network architecture reference

Ed. : M. Vigoureux (ALF)

June 2007

Updated version:
September 2007

D32

Data Plane Specification

Ed. : W. Tavernier (IBBT)

September 2007

D33

Control Plane Specification

Ed. : D. Papadimitriou (ALB)

September 2007

D34

TIGER solution architecture including, operational aspects, optimization guidelines and migration strategies

Ed. : G. Thouénon (FT)

February 2008

D36*

TIGER implementation specification

Ed. : M. Vigoureux (ALF)

June 2008

WP4

D41

Description of simulator model and implementation

Ed. : F. Liotopoulos (VTRIP)

September 2007

WP5

D51

Intermediate evaluation criteria definition and benchmarking methodology

Ed. : D. Papadimitriou (ALB)

June 2007

D53

TIGER benchmarking

Ed. : K. Casier (IBBT)/D. Papadimitriou (ALB)

July 2008

WP6

D61

Description of the Dissemination Plans

Ed. : D. Papadimitriou (ALB)

July 2007

D62

Description of the Exploitation Plans

Ed. : N. Le Sauze (ALF)

June 2008

* may be available on request